Substation Scout

Tap 345-kV Austrop to Zorn substation interconnection queue

2 active projects totaling 321.3 MW in the ERCOT queue.

2 ERCOT queue filings name Tap 345-kV Austrop to Zorn as the point of interconnection, all in Bastrop County, TX.

Target commercial operation dates as filed run from Dec 2027 to Dec 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Waterloo Solar I, LLC (1 filing), Waterloo BESS, LLC (1 filing).

2active projects
321.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
25INR0422 Waterloo Solar 1 n/r 201.3 Solar SS Completed, FIS Completed, IA Dec 2027
25INR0447 Waterloo BESS 1 n/r 120 Battery SS Completed, FIS Started, IA Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

3 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-0925INR0422Capacity revised+0.7 SS Completed, FIS Completed, IA → SS Completed, FIS Completed, IA
2026-10-0525INR0422Status changen/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA
2026-09-0725INR0447Capacity revised+14.4 SS Completed, FIS Started, IA → SS Completed, FIS Started, IA

Other ERCOT queue substations in Bastrop County, TX

All 16 ERCOT queue filings in Bastrop County, TX.