Tap 345-kV Austrop to Zorn substation interconnection queue
2 active projects totaling 321.3 MW in the ERCOT queue.
2 ERCOT queue filings name Tap 345-kV Austrop to Zorn as the point of interconnection, all in Bastrop County, TX.
Target commercial operation dates as filed run from Dec 2027 to Dec 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Waterloo Solar I, LLC (1 filing), Waterloo BESS, LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 25INR0422 | Waterloo Solar 1 | n/r | 201.3 | Solar | SS Completed, FIS Completed, IA | Dec 2027 |
| 25INR0447 | Waterloo BESS 1 | n/r | 120 | Battery | SS Completed, FIS Started, IA | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
3 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | 25INR0422 | Capacity revised | +0.7 | SS Completed, FIS Completed, IA → SS Completed, FIS Completed, IA |
| 2026-10-05 | 25INR0422 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
| 2026-09-07 | 25INR0447 | Capacity revised | +14.4 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Other ERCOT queue substations in Bastrop County, TX
- (#) LOST PINES: 3 active, 1,106 MW of 3 filed
- (#) SIM GIDEON: 2 active, 1,106 MW of 2 filed
- Tap Lytton - Holman: 2 active, 283.1 MW of 2 filed