Tap 345-kV Austrop to Zorn substation interconnection queue

2 active projects totalling 320.6 MW in the ERCOT queue.

2active projects
320.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
25INR0422 Waterloo Solar 1 n/r 200.6 Solar SS Completed, FIS Completed, IA
25INR0447 Waterloo BESS 1 n/r 120 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.