Tap Lytton - Holman substation interconnection queue

2 active projects totaling 283.1 MW in the ERCOT queue.

2 ERCOT queue filings name Tap Lytton - Holman as the point of interconnection, all in Bastrop County, TX.

Target commercial operation date as filed: Sep 2026 (2 filings).

Interconnecting entity as filed: RWE Solar Development, LLC (2 filings).

2active projects
283.1active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
21INR0413 Big Star Solar 345 203.1 Solar SS Completed, FIS Completed, IA Sep 2026
21INR0469 Big Star Storage 345 80 Battery SS Completed, FIS Completed, IA Sep 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Bastrop County, TX

All 16 ERCOT queue filings in Bastrop County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first