Tap Lytton - Holman substation interconnection queue
2 active projects totaling 283.1 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Lytton - Holman as the point of interconnection, all in Bastrop County, TX.
Target commercial operation date as filed: Sep 2026 (2 filings).
Interconnecting entity as filed: RWE Solar Development, LLC (2 filings).
2active projects
283.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 21INR0413 | Big Star Solar | 345 | 203.1 | Solar | SS Completed, FIS Completed, IA | Sep 2026 |
| 21INR0469 | Big Star Storage | 345 | 80 | Battery | SS Completed, FIS Completed, IA | Sep 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Bastrop County, TX
- (#) LOST PINES: 3 active, 1,106 MW of 3 filed
- (#) SIM GIDEON: 2 active, 1,106 MW of 2 filed
- Tap 345-kV Austrop to Zorn: 2 active, 321.3 MW of 2 filed
Site Scanner