Tap Lytton - Holman substation interconnection queue

2 active projects totalling 283.1 MW in the ERCOT queue.

2active projects
283.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
21INR0413 Big Star Solar 345 203.1 Solar SS Completed, FIS Completed, IA
21INR0469 Big Star Storage 345 80 Battery SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.