(#) LOST PINES substation interconnection queue
3 active projects totaling 1,106 MW in the ERCOT queue.
3 ERCOT queue filings name (#) LOST PINES as the point of interconnection, all in Bastrop County, TX.
Target commercial operation date as filed: Jun 2033 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: LCRA (3 filings).
3active projects
1,106active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 30INR0052 | Lost Pines Power Park | 345 | 880 | Gas | SS Completed, FIS Started, IA | Jun 2033 |
| 29INR0166 | LOST PINES GAS RECIP | 345 | 113 | Gas | SS Completed, FIS Started, IA | Jun 2033 |
| 31INR0010 | LOST PINES GAS RECIP PHASE 2 | 345 | 113 | Gas | SS Completed, FIS Started, IA | Jun 2033 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Bastrop County, TX
- (#) SIM GIDEON: 2 active, 1,106 MW of 2 filed
- Tap 345-kV Austrop to Zorn: 2 active, 321.3 MW of 2 filed
- Tap Lytton - Holman: 2 active, 283.1 MW of 2 filed