Substation Scout

Sim Gideon

Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Bastrop County. First named in the release with data as of February 1, 2016.

Bastropcounty as printed
138kV
LCRATSCutility
8projects listed

A HIFLD substation record has the same name and county: SIM GIDEON (BASTROP County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Bastrop, TX: ERCOT queue, 14 active of 16. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
LCRATSC Sim Gideon Substation Upgrade
The upgrade of the Sim Gideon Substation to increase its current-carrying capability and improve overall system reliability.
ERCOT project 109786 · utility no. PLC-8317
LCRATSC
Tier 4
Planned
Future tab
138 May 2029 Sim Gideon
Bastrop County
Sim Gideon
Alum Creek to Sim Gideon Transmission Line Upgrade
Upgrade L_SIMGID8_1Y (Bus #7310) - L_ALUMCR8_1Y (Bus #7318) 138.0-kV line as an LCP for Batch Zero Base Load.
ERCOT project 110073
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2030 Sim Gideon to Alum Creek
Bastrop County
Sim Gideon, Alum Creek
Bastrop West - Sim Gideon Transmission Line Upgrade
LCRA will upgrade the transmission line from SIMGID (7130) - BASTWE (7555), to achieve a 533 MVA min rating. Upgrade project to support Batch Zero Base Load
ERCOT project 110138
LCRATSC
Tier 4
Conceptual
Future tab
138 May 2030 Sim Gideon to Bastrop West
Bastrop County
Sim Gideon, Bastrop West
Sim Gideon Substation Upgrade
LCRA TSC will upgrade terminal equipment in series L_WINCHE8_1Y (Bus #7306) - L_SIMGID8_1Y (Bus #7310) 138.0-kV line transmission line to achieve a higher operational rating, minimum 4000A, as an LCP upgrade for Batch Zero Base Load.
ERCOT project 110172
LCRATSC
Tier 4
Conceptual
Future tab
138 May 2029 Sim Gideon
Bastrop County
Sim Gideon
Austrop - Sim Gideon Transmission Line Upgrade
Upgrade the Austrop - Sim Gideon 138-kV double-circuit transmission line, including lines connecting to Bastrop City and Webberville, to achieve a minimum 560 MVA emergency rating for all lines in series at the Austrop, Webberville, Sim Gideon, Settlers, and Bastrop City substations. Ideally, lines will be rated to 4000A. This is an LCP Upgrade project to support Batch Zero Base Load
ERCOT project 110185
LCRATSC
Tier 4
Conceptual
Future tab
138 Dec 2028 Austrop to Sim Gideon
Travis / Bastrop County
Austrop, Sim Gideon
Sim Gideon - Swiftex Transmission Line Upgrade
LCRA TSC will upgrade T608 Sim Gideon - Swiftex 138-kV transmission line to achieve a higher operational rating.
ERCOT project 73123 · RPG 24RPG014 · RTP 2023-SC15
LCRATSC
Tier 3
Planned
Completed tab
138 Dec 2025
actual 2025-12
Sim Gideon to Swiftex
Bastrop County
Sim Gideon, Swiftex
Austrop - Sim Gideon Transmission Line Upgrade
LCRA TSC will upgrade the Austrop - Sim Gideon 138-kV double-circuit transmission line to achieve a higher operational rating. This line consists of the following transmission circuits. T171 Austrop - Sim Gideon T172 Bastrop City - Sim Gideon (via Settlers) T231 Bastrop City - Webberville (via Settlers) T673 Austrop - Webberville
ERCOT project 91487 · utility no. PLC-8100
LCRATSC
Tier 3
Planned
Future tab
138 Dec 2028 Austrop to Sim Gideon
Travis / Bastrop County
Austrop, Sim Gideon
Sim_Gideon_Winchester_Transmission_Line_Upgrade
LCRA TSC will upgrade Sim Gideon - Winchester 138-kV transmission line to achieve a higher operational rating
ERCOT project 92565 · utility no. PLC-7654 · RTP 2023-SC15
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 No terminals printed
Bastrop County
Sim Gideon, Winchester

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026109786First listedon the Future tab
July 13, 2026110073First listedon the Future tab
July 13, 2026110138First listedon the Future tab
July 13, 2026110172First listedon the Future tab
July 13, 2026110185First listedon the Future tab
July 13, 202691487First listedon the Future tab
February 1, 202673123Moved between tabsCurrent-year planned → Completed
February 1, 202692565Projected in-service dateMay 2026 → May 2028
June 1, 202573123Moved between tabsFuture → Current-year planned
June 1, 202592565First listedon the Future tab
June 1, 202473123Projected in-service dateMay 2025 → Dec 2025

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first