Space City Solar
ERCOT queue ID 21INR0341
Space City Solar (21INR0341) is listed in the ERCOT interconnection queue as a 366 MW solar project in Wharton County, TX. The filing names Hillje as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 1, 2027. It records the screening study as complete on March 6, 2020 and the interconnection agreement as signed on December 11, 2025.
| Queue ID | 21INR0341 |
|---|---|
| Project name | Space City Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Hillje |
| Point of interconnection | 44200 Hillje 345kV |
| County | Wharton |
| State | TX |
| Voltage | 345 kV |
| Capacity | 366 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-06-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Hillje substation: 4 requests in the ERCOT queue, 4 active totaling 1,518.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 20INR0069 | Danish Fields Solar | 602.8 | Solar | SS Completed, FIS Completed, IA |
| 21INR0505 | Ramsey Storage | 500 | Battery | SS Completed, FIS Started, IA |
| 20INR0238 | Voyager Storage | 50.1 | Battery | SS Completed, FIS Started, No IA |
Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Apollo Solar Ranch, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-12-11 |
| Screening study complete | 2020-03-06 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.