Substation Scout

Hector Solar

ERCOT queue ID 25INR0220

Hector Solar (25INR0220) is listed in the ERCOT interconnection queue as a 81.6 MW solar project in Navarro County, TX. The filing names Haney (213) - Hubbard_8 Line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 8, 2028. It records the screening study as complete on January 20, 2023.

Queue ID25INR0220
Project nameHector Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationHaney (213) - Hubbard_8 Line
Point of interconnectionHaney (213) - Hubbard_8 (3515) 138kV Line
CountyNavarro
StateTX
Voltage138 kV
Capacity81.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-10-08
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Haney (213) - Hubbard_8 Line substation: 2 requests in the ERCOT queue, 1 active totaling 81.6 MW.

Queue IDProjectMWResourceStatus
25INR0221Hector Storage42.7BatteryCancelled

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHector Solar, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2023-01-20
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.