Duval, TX interconnection queue

16 active projects totalling 3,803.4 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

16active projects
3,803.4active MW
18total filed
Queue IDProjectkVMWResourceStatus
27INR0150 Cielo Vista Solar 345 503.3 Solar SS Completed, FIS Started, No IA
28INR0497 Cielo Vista Power II 345 350.4 Gas SS Started, FIS Started, No IA
28INR0325 Cielo Vista Power Gas Plant 345 343.8 Gas SS Completed, FIS Started, No IA
29INR0115 Cielo Vista Storage 345 310.8 Battery SS Completed, FIS Started, No IA
29INR0146 Estrella Dorada Wind 345 306 Wind SS Completed, FIS Started, No IA
29INR0160 Cazadores Solar n/r 301.6 Solar SS Completed, FIS Started, No IA
28INR0040 Black Hawk Solar n/r 251.3 Solar SS Completed, FIS Started, No IA
28INR0229 Allthorn Solar 138 231.5 Solar SS Completed, FIS Started, No IA
28INR0230 Allthorn BESS 138 205.2 Battery SS Completed, FIS Started, No IA
29INR0124 Apricot Sun Solar 345 200.8 Solar SS Completed, FIS Started, No IA
29INR0125 Apricot Sun Storage 345 200.8 Battery SS Completed, FIS Started, No IA
28INR0168 Guajillo Wind 345 199.9 Wind SS Completed, FIS Started, No IA
26INR0196 Realitos Solar SLF 138 150.5 Solar SS Completed, FIS Started, No IA
26INR0391 Jumping Cactus Storage 138 125.3 Battery SS Completed, FIS Started, No IA
26INR0393 Dove Wing Storage 138 122.2 Battery SS Completed, FIS Started, No IA
21INR0326 Dove Run Solar n/r 120.9 Solar Inactive
25INR0109 Sun Cactus Solar n/r 120.6 Solar Inactive
26INR0195 Realitos Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.