Substation Scout

Apricot Sun Solar

ERCOT queue ID 29INR0124

Apricot Sun Solar (29INR0124) is listed in the ERCOT interconnection queue as a 200.8 MW solar project in Duval County, TX. The filing names Tap (Cruce) - (San Miguel) Ckt 1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2029. It records the screening study as complete on June 25, 2025.

Queue ID29INR0124
Project nameApricot Sun Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap (Cruce) - (San Miguel) Ckt 1
Point of interconnectionTap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1
CountyDuval
StateTX
Voltage345 kV
Capacity200.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap (Cruce) - (San Miguel) Ckt 1 substation: 2 requests in the ERCOT queue, 2 active totaling 401.6 MW.

Queue IDProjectMWResourceStatus
29INR0125Apricot Sun Storage200.8BatterySS Completed, FIS Started, No IA

Duval, TX: 18 requests in the ERCOT queue, 14 active totaling 3,401.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityApricot Sun Energy Center, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2025-06-25
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first