Allthorn BESS
ERCOT queue ID 28INR0230
Allthorn BESS (28INR0230) is listed in the ERCOT interconnection queue as a 205.2 MW battery project in Duval County, TX. The filing names Tap BRUNI44A (#) - CRESTONI4A (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 15, 2029. It records the screening study as complete on May 13, 2025.
| Queue ID | 28INR0230 |
|---|---|
| Project name | Allthorn BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap BRUNI44A (#) - CRESTONI4A (#) |
| Point of interconnection | Tap 138 kV BRUNI44A (#8297) - CRESTONI4A (#8695) |
| County | Duval |
| State | TX |
| Voltage | 138 kV |
| Capacity | 205.2 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-01-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Duval, TX: 18 requests in the ERCOT queue, 14 active totaling 3,401.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | ALLTHORN SOLAR, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2025-05-13 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.