Allthorn BESS

ERCOT queue ID 28INR0230

Allthorn BESS (28INR0230) is listed in the ERCOT interconnection queue as a 205.2 MW battery project in Duval County, TX. The filing names Tap BRUNI44A (#) - CRESTONI4A (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 15, 2029. It records the screening study as complete on May 13, 2025.

Queue ID28INR0230
Project nameAllthorn BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationTap BRUNI44A (#) - CRESTONI4A (#)
Point of interconnectionTap 138 kV BRUNI44A (#8297) - CRESTONI4A (#8695)
CountyDuval
StateTX
Voltage138 kV
Capacity205.2 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-01-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Duval, TX: 18 requests in the ERCOT queue, 14 active totaling 3,401.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityALLTHORN SOLAR, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-05-13

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.