Substation Scout

Cazadores Solar

ERCOT queue ID 29INR0160

Cazadores Solar (29INR0160) is listed in the ERCOT interconnection queue as a 301.6 MW solar project in Duval County, TX. The filing names Tap CRUCE7A – MIGUEL5 CKT 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 10, 2029. It records the screening study as complete on October 1, 2025.

Queue ID29INR0160
Project nameCazadores Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap CRUCE7A – MIGUEL5 CKT 2
Point of interconnectionTap 345 kV (80079) CRUCE7A – (5901) MIGUEL5 CKT 2
CountyDuval
StateTX
Voltage345 kV
Capacity301.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-04-10
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Duval, TX: 18 requests in the ERCOT queue, 14 active totaling 3,401.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityOCI Energy LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2025-10-01
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.