Dove Wing Storage
ERCOT queue ID 26INR0393
Dove Wing Storage (26INR0393) is listed in the ERCOT interconnection queue as a 122.2 MW battery project in Duval County, TX. The filing names Zenaida Bus# as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2029. It records the screening study as complete on April 29, 2024.
| Queue ID | 26INR0393 |
|---|---|
| Project name | Dove Wing Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Zenaida Bus# |
| Point of interconnection | 138 kV Zenaida Bus# 80043 |
| County | Duval |
| State | TX |
| Voltage | 138 kV |
| Capacity | 122.2 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Zenaida Bus# substation: 2 requests in the ERCOT queue, 2 active totaling 247.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 26INR0391 | Jumping Cactus Storage | 125.3 | Battery | SS Completed, FIS Started, No IA |
Duval, TX: 18 requests in the ERCOT queue, 14 active totaling 3,401.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Dove Wing Energy Center, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-04-29 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.