Estrella Dorada Wind

ERCOT queue ID 29INR0146

Estrella Dorada Wind (29INR0146) is listed in the ERCOT interconnection queue as a 306 MW wind project in Duval County, TX. The filing names Tap Cruce - San Miguel Ckt 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 13, 2029. It records the screening study as complete on September 30, 2025.

Queue ID29INR0146
Project nameEstrella Dorada Wind
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Cruce - San Miguel Ckt 2
Point of interconnectionTap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2
CountyDuval
StateTX
Voltage345 kV
Capacity306 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2029-07-13
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Duval, TX: 18 requests in the ERCOT queue, 14 active totaling 3,401.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityEstrella Dorada Wind Farm, LLC
CDR reporting zoneSOUTH
Fuel codeWIN
Technology codeWT
Screening study complete2025-09-30
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.