Substation Scout

Walla Walla-Pendleton line substation interconnection queue

2 active projects totalling 63 MW in the BPA queue, plus 2 with terminal status (shown greyed).

2active projects
63active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0339 Not reported 69 152 Wind WITHDRAWN
G0338 Not reported 69 100 Wind WITHDRAWN
G109 Combine Hills II 69 63 Wind ENERGIZED
G0975 Not reported 69 0 Wind STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.