Substation Scout

Douglas, OR interconnection queue

1 active project totalling 0 MW in the BPA queue, plus 10 with terminal status (shown greyed).

1active projects
0active MW
11total filed
Queue IDProjectkVMWResourceStatus
G0806 Not reported 115 600 Other WITHDRAWN
G0807 Not reported 230 600 Hydro WITHDRAWN
G0808 Not reported 115 600 Battery WITHDRAWN
G0809 Not reported 230 600 Hydro WITHDRAWN
G0996 Not reported 500 400 Solar WITHDRAWN
G0801 Not reported n/r 200 Battery WITHDRAWN
G0804 Not reported 115 200 Other WITHDRAWN
G0805 Not reported 230 200 Other WITHDRAWN
G0800 Not reported n/r 80 Other WITHDRAWN
G0421 Not reported n/r 2 Hydro WITHDRAWN
G0975 Not reported 69 0 Wind STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.