Substation Scout

BPA's Gardiner Substation or Central Lincoln PUD's Gardiner Substation substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0801 Not reported n/r 200 Battery WITHDRAWN
G0800 Not reported n/r 80 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.