Coyote Springs Substation substation interconnection queue

2 active projects totalling 40 MW in the BPA queue.

2active projects
40active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0620 Coyote Springs I n/r 27 Gas ENERGIZED
G0765 Coyote Springs 1 n/r 13 Gas ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.