McNary Substation substation interconnection queue

1 active project totalling 210 MW in the BPA queue, plus 2 with terminal status (shown greyed).

1active projects
210active MW
3total filed
Queue IDProjectkVMWResourceStatus
G1 PG and E Generation 230 581 Gas WITHDRAWN
G0535 Not reported n/r 210 Hydro STUDY COMPLETED
G41 100MW McNary n/r 100 Gas WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.