BPA's Gardiner Substation or Tahkenitch Substation. substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0806 Not reported 115 600 Other WITHDRAWN
G0809 Not reported 230 600 Hydro WITHDRAWN
G0804 Not reported 115 200 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.