Substation Scout

Combine Hills II tap to Walla Walla-Pendleton No 1 line substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G1013 Not reported 69 250.1 Wind WITHDRAWN
G1012 Not reported 69 67 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.