Substation Scout

Pinal, AZ interconnection queue

27 active projects totaling 5,881.9 MW in the APS queue, plus 53 with terminal status (shown grayed).

27active projects
5,881.9active MW
80total filed
Queue IDProjectkVMWResourceStatus
Q469 Not reported 500 1,650 Hybrid Withdrawn
Q260 Not reported 230 900 Gas Withdrawn
Q257 Not reported 230 500 Gas Withdrawn
Q416 Not reported 500 500 Hybrid Withdrawn
Q492 Not reported 500 500 Hybrid Withdrawn
Q563 Not reported 500 500 Hybrid Active
Q251 Not reported 230 495 Gas Withdrawn
Q4 Not reported 230 450 Gas Withdrawn
Q484 Not reported 230 400 Hybrid Withdrawn
Q537 Not reported 230 400 Hybrid Active
Q589 Not reported 230 400 Other Active
Q54 Not reported 115 352 Solar Withdrawn
Q501 Not reported 230 350 Hybrid Withdrawn
Q584 Not reported 230 350 Battery Active
Q388 Not reported 230 323 Hybrid Active
Q359 Not reported 230 315 Hybrid Active
Q381 Not reported 500 300 Wind Withdrawn
Q385 Not reported 230 300 Hybrid Withdrawn
Q516 Not reported 230 300 Hybrid Withdrawn
Q578 Not reported 230 300 Other Active
Q78 Not reported 115 297 Solar Withdrawn
Q392 Not reported 230 270 Hybrid Active
Q536 Not reported n/r 258.7 Battery Withdrawn
Q295 Not reported 230 250 Hybrid Active
Q361 Not reported 230 250 Hybrid Withdrawn
Q386 Not reported 230 250 Hybrid Withdrawn
Q426 Not reported 230 250 Hybrid Withdrawn
Q429 Not reported 230 250 Battery Withdrawn
Q432 Not reported 500 250 Solar Withdrawn
Q569 Not reported 230 250 Hybrid Active
Q594 Not reported 230 250 Other Active
Q413 Not reported 230 223 Hybrid Withdrawn
Q239 Not reported 230 213.8 Hybrid Active
SP106 Not reported 230 213.8 Hybrid Active
Q240 Not reported 230 200 Solar Withdrawn
Q243 Not reported 230 200 Solar Withdrawn
Q365 Not reported 230 200 Hybrid Withdrawn
Q483 Not reported 230 200 Battery Withdrawn
Q554 Not reported 230 200 Other Active
Q573 Not reported 230 200 Other Active
Q604 Not reported 230 200 Other Active
SP111 Not reported 69 192 Hybrid Active
Q547 Not reported 230 180 Hybrid Withdrawn
Q356 Not reported 115 150 Hybrid Withdrawn
Q587 Not reported n/r 150 Other Active
Q353 Not reported 115 145 Hybrid Withdrawn
Q548 Not reported 115 145 Other Active
Q253 Not reported 115 140 Hybrid Withdrawn
Q264 Not reported 230 130 Hybrid Active
Q588 Not reported n/r 130 Other Active
Q336 Not reported 69 125 Hybrid Withdrawn
Q254 Not reported 69 100 Solar Active
Q256 Not reported 69 100 Hybrid Active
Q464 Not reported 69 100 Hybrid Withdrawn
Q493 Not reported 69 100 Hybrid Active
Q505 Not reported 230 100 Hybrid Withdrawn
Q543 Not reported 230 100 Hybrid Withdrawn
Q579 Not reported 230 100 Hybrid Active
Q46 Not reported 69 80 Solar Withdrawn
Q48 Not reported 69 80 Solar Withdrawn
Q49 Not reported 69 80 Solar Withdrawn
Q244 Not reported 115 75 Solar Withdrawn
Q267 Not reported 69 75 Hybrid Withdrawn
Q328 Not reported 230 75 Hybrid Withdrawn
Q329 Not reported 230 75 Hybrid Withdrawn
Q498 Not reported 230 75 Solar Withdrawn
Q382 Not reported 69 74.9 Hybrid Withdrawn
Q608 Not reported 230 55 Other Active
SP108 Not reported n/r 50.8 Other Withdrawn
Q72 Not reported 69 45 Solar Withdrawn
Q228 Not reported 115 44.3 Solar Operational
Q207 Not reported 69 30 Solar Withdrawn
Q220 Not reported 69 20 Solar Withdrawn
Q262 Not reported 69 20 Solar Withdrawn
Q263 Not reported 69 20 Battery Withdrawn
Q321 Not reported 69 20 Solar Withdrawn
Q349 Not reported 69 20 Battery Withdrawn
Q92 Not reported 69 20 Solar Withdrawn
Q191 Not reported 69 15 Solar Withdrawn
Q170 Not reported 12 5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.