APS request Q537

APS queue ID Q537

Queue request Q537 was listed in the APS interconnection queue at the end of 2025 as a 400 MW hybrid project in Pinal County, AZ, according to Berkeley Lab’s queue data file. The filing names 3 Miles South of the Milligan Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2027.

Queue IDQ537
Project nameNot reported
Status (as published)Active
Substation3 Miles South of the Milligan Substation
Point of interconnection3 Miles South of the Milligan 230KV Substation
CountyPinal
StateAZ
Voltage230 kV
Capacity400 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pinal, AZ: 80 requests in the APS queue, 27 active totaling 5,881.9 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Transitional Cluster: Cluster Study (Phase 2)
Queue date2023-09-07
Components (hybrid)Solar 400 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.