APS request Q604

APS queue ID Q604

Queue request Q604 was listed in the APS interconnection queue at the end of 2025 as a 200 MW project in Pinal County, AZ, according to Berkeley Lab’s queue data file. The filing names Santa Rosa Tot Momoli line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2030.

Queue IDQ604
Project nameNot reported
Status (as published)Active
SubstationSanta Rosa Tot Momoli line
Point of interconnectionSanta Rosa Tot Momoli 230kV line
CountyPinal
StateAZ
Voltage230 kV
Capacity200 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2030-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pinal, AZ: 80 requests in the APS queue, 27 active totaling 5,881.9 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study
Queue date2025-05-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.