APS request Q563
APS queue ID Q563
Queue request Q563 was listed in the APS interconnection queue at the end of 2025 as a 500 MW hybrid project in Pinal County, AZ, according to Berkeley Lab’s queue data file. The filing names Saguaro to Cholla Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2028.
| Queue ID | Q563 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Saguaro to Cholla Line |
| Point of interconnection | Saguaro to Cholla 500kV Line |
| County | Pinal |
| State | AZ |
| Voltage | 500 kV |
| Capacity | 500 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Pinal, AZ: 80 requests in the APS queue, 27 active totaling 5,881.9 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Phase 1 Cluster Study |
| Queue date | 2024-05-10 |
| Components (hybrid) | Solar 500 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.