Substation Scout

APS request Q584

APS queue ID Q584

Queue request Q584 was listed in the APS interconnection queue at the end of 2025 as a 350 MW battery project in Pinal County, AZ, according to Berkeley Lab’s queue data file. The filing names Bianco Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2029.

Queue IDQ584
Project nameNot reported
Status (as published)Active
SubstationBianco Substation
Point of interconnection230 kV Bianco Substation
CountyPinal
StateAZ
Voltage230 kV
Capacity350 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pinal, AZ: 80 requests in the APS queue, 27 active totaling 5,881.9 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study
Queue date2025-05-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first