Substation Scout

APS request Q254

APS queue ID Q254

Queue request Q254 was listed in the APS interconnection queue at the end of 2025 as a 100 MW solar project in Pinal County, AZ, according to Berkeley Lab’s queue data file. The filing names Thornton Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 28, 2022.

Queue IDQ254
Project nameNot reported
Status (as published)Active
SubstationThornton Substation
Point of interconnectionThornton 69kV Substation
CountyPinal
StateAZ
Voltage69 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2022-10-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pinal, AZ: 80 requests in the APS queue, 27 active totaling 5,881.9 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In Design
Queue date2017-03-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first