APS request SP106
APS queue ID SP106
Queue request SP106 was listed in the APS interconnection queue at the end of 2025 as a 213.8 MW hybrid project in Pinal County, AZ, according to Berkeley Lab’s queue data file. The filing names Saguaro substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2025.
| Queue ID | SP106 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Saguaro substation |
| Point of interconnection | Saguaro 230kV substation |
| County | Pinal |
| State | AZ |
| Voltage | 230 kV |
| Capacity | 213.8 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2025-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Pinal, AZ: 80 requests in the APS queue, 27 active totaling 5,881.9 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Surplus Request: Complete |
| Queue date | 2023-01-27 |
| Components (hybrid) | Solar 213.75 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.