APS request SP111
APS queue ID SP111
Queue request SP111 was listed in the APS interconnection queue at the end of 2025 as a 192 MW hybrid project in Pinal County, AZ, according to Berkeley Lab’s queue data file. The filing names Thornton SS as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.
| Queue ID | SP111 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Thornton SS |
| Point of interconnection | Thornton 69 kV SS |
| County | Pinal |
| State | AZ |
| Voltage | 69 kV |
| Capacity | 192 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2026-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Pinal, AZ: 80 requests in the APS queue, 27 active totaling 5,881.9 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Surplus Request: In Review |
| Components (hybrid) | Solar 192 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.