Richmond substation interconnection queue
1 active project totaling 2 MW in the PJM queue, plus 6 with terminal status (shown grayed).
7 PJM queue filings name Richmond as the point of interconnection, all in Philadelphia County, PA.
Target commercial operation dates as filed run from Dec 2005 to Dec 2016 (6 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U1-012 | Richmond | n/r | 630 | Gas | Withdrawn | Jan 2013 |
| G45 | Richmond | n/r | 575 | Gas | Withdrawn | Dec 2005 |
| H08 | Richmond 230kV | 230 | 560 | Gas | Withdrawn | Dec 2005 |
| G07 | Richmond | n/r | 100 | Gas | Withdrawn | n/r |
| T113 | Richmond 230kV | 230 | 16 | Other | Withdrawn | May 2010 |
| W2-014 | Richmond | n/r | 2 | Other | In Service | Nov 2010 |
| AB1-074 | Richmond 230kV | 230 | 0 | Battery | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Richmond (PECO, 7 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Philadelphia County, PA
- Chichester: 2 active, 750 MW of 2 filed
- Grays Ferry: 1 active, 13 MW of 3 filed
- Passyunk: none active of 3 filed
- Penrose #2: none active of 2 filed