Richmond substation interconnection queue
1 active project totalling 2 MW in the PJM queue, plus 6 with terminal status (shown greyed).
1active projects
2active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U1-012 | Richmond | n/r | 630 | Gas | Withdrawn |
| G45 | Richmond | n/r | 575 | Gas | Withdrawn |
| H08 | Richmond 230kV | 230 | 560 | Gas | Withdrawn |
| G07 | Richmond | n/r | 100 | Gas | Withdrawn |
| T113 | Richmond 230kV | 230 | 16 | Other | Withdrawn |
| W2-014 | Richmond | n/r | 2 | Other | In Service |
| AB1-074 | Richmond 230kV | 230 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.