Sand Lake
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Reeves County. First named in the release with data as of February 1, 2016.
Reevescounty as printed
138, 765kV
AEP TNC, ONCORutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Reeves, TX: ERCOT queue, 24 active of 27. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Solstice to Sand Lake: Construct New 765 kV Single Circuit Line Construct a new 765 kV single circuit line from Solstice to Sand Lake ERCOT project 102955 · utility no. TP2025846 · RPG 25RPG022 · RTP temp |
AEP TNC Tier 1 |
Planned Future tab |
765 | Dec 2030 | Solstice to Sand Lake Pecos / Reeves County |
Solstice, Sand Lake |
| Lean Clay 138 kV Switch Construct a new 138 kV switch ERCOT project 50725 · utility no. R8658 |
ONCOR Tier 4 |
In-Service Completed tab |
138 | Feb 2025 actual 2025-02 |
Culberson to Sand Lake Reeves County |
Culberson, Sand Lake |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 50725 | Status as reported | Planned → In-Service |
| June 1, 2026 | 102955 | First listed | on the Future tab |
| June 1, 2025 | 50725 | Moved between tabs | Future → Completed |
| October 1, 2024 | 50725 | Projected in-service date | Dec 2024 → Feb 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.