Overland
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Pecos County. First named in the release with data as of February 1, 2026.
Described as new. The quoted wording calls this substation new. “new 345-kV Overland substation” — project 102788 description, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Pecos, TX: ERCOT queue, 58 active of 63. Same county, not the same substation.
Location
Pecos County, TX
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. TPIT places the station on the Bakersfield to Solstice 345 kV double-circuit (LCRA T718 and T683) line; both ends are in OpenStreetMap: LCRA Bakersfield Substation (way 343434427, 30.9759,-102.2891) and AEP Solstice Substation (way 500535889, 30.9483,-103.3617), ~103 km apart, both in Pecos County. The station is somewhere on that line; no public document found that draws or describes its site.
Sources: ERCOT TPIT, project(s) 102788 (release 39, 2026-10-01) · OpenStreetMap: Bakersfield Substation (way 343434427), Solstice Substation (way 500535889) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Overland_Substation_Addition Construct a new 345-kV Overland substation and cut-in the double circuit Bakersfield Substation to Solstice Substation 345-kV transmission line (T718 and T683) to provide two (2) Points of Interconnection ERCOT project 102788 |
LCRATSC Tier 4 |
Planned Future tab |
345 | May 2027 | No terminals printed Pecos County |
Overland, Bakersfield, Solstice |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 102788 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.