Bakersfield
Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Pecos County. First named in the release with data as of June 1, 2015.
A HIFLD substation record has the same name and county: BAKERSFIELD (PECOS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Pecos, TX: ERCOT queue, 58 active of 63. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Overland_Substation_Addition Construct a new 345-kV Overland substation and cut-in the double circuit Bakersfield Substation to Solstice Substation 345-kV transmission line (T718 and T683) to provide two (2) Points of Interconnection ERCOT project 102788 |
LCRATSC Tier 4 |
Planned Future tab |
345 | May 2027 | No terminals printed Pecos County |
Overland, Bakersfield, Solstice |
| Bakersfield_NevillRoad_NorthMcCamey_Transmission_Line_Upgrade PL and LCRA joint PBRP_L14 project by upgrading of the existing Bakersfield - Nevill Road - North McCamey 345kV transmission lines and adding of new 345kV Bakersfield - Nevill Road - North McCamey second circuits ERCOT project 102795 · utility no. PBRP_L14_Joint |
GPL Tier 1 |
Planned Future tab |
345 | May 2030 | Nevill Road to Bakersfield/North McCamey Upton / Pecos County |
Nevill Road, Bakersfield, North McCamey |
| Twelvemile Substation Addition Cuts into first circuit ERCOT project 6719A · utility no. 1018769 · RPG 21RPG001 |
LCRATSC Tier 4 |
In-Service Completed tab |
345 | May 2025 actual 2025-06 |
Bakersfield to Schneeman Draw Pecos / Crockett County |
Bakersfield, Schneeman Draw |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| February 1, 2026 | 102788 | First listed | on the Future tab |
| February 1, 2026 | 102795 | First listed | on the Future tab |
| June 1, 2025 | 6719A | First listed | on the Completed tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.