Substation Scout

Woodsdale substation interconnection queue

7 active projects totalling 100.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

7active projects
100.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
AF1-247 Woodsdale 345 kV 345 30.9 Solar Withdrawn
AE2-267 Woodsdale Renewable Energy Center 345 28.6 Solar Engineering and Procurement
C01-1220 Woodsdale 345 kV 345 13.6 Gas Active
C01-1221 Woodsdale 345 kV 345 12.8 Gas Active
C01-1101 Woodsdale 345 kV 345 12.4 Gas Active
C01-1222 Woodsdale 345 kV 345 11.8 Gas Active
C01-1217 Woodsdale 345 kV 345 11.2 Gas Active
C01-1218 Woodsdale 345 kV 345 10.5 Gas Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.