Woodsdale substation interconnection queue

7 active projects totaling 100.9 MW in the PJM queue, plus 1 with terminal status (shown grayed).

8 PJM queue filings name Woodsdale as the point of interconnection, all in Butler County, OH.

Target commercial operation dates as filed run from Oct 2021 to Jun 2029 (8 filings). 6 active filings target a date after November 27, 2026.

Transmission owner as filed: DEOK (6 filings).

7active projects
100.9active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-247 Woodsdale 345 kV 345 30.9 Solar Withdrawn Oct 2021
AE2-267 Woodsdale Renewable Energy Center 345 28.6 Solar Suspended Jun 2026
C01-1220 Woodsdale 345 kV 345 13.6 Gas Active Jun 2029
C01-1221 Woodsdale 345 kV 345 12.8 Gas Active Jun 2029
C01-1101 Woodsdale 345 kV 345 12.4 Gas Active Jun 2029
C01-1222 Woodsdale 345 kV 345 11.8 Gas Active Jun 2027
C01-1217 Woodsdale 345 kV 345 11.2 Gas Active Jun 2027
C01-1218 Woodsdale 345 kV 345 10.5 Gas Active Jun 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Woodsdale (DEOK, 11 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-02AE2-267Status changen/a Engineering and Procurement → Suspended

Other PJM queue substations in Butler County, OH

All 24 PJM queue filings in Butler County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first