Substation Scout

Woodsdale 345 kV

PJM queue ID C01-1218

Woodsdale 345 kV (C01-1218) is listed in the PJM interconnection queue as a 10.5 MW gas project in Butler County, OH. The filing names Woodsdale as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2028.

Queue IDC01-1218
Project nameWoodsdale 345 kV
Status (as published)Active
SubstationWoodsdale
Point of interconnectionWoodsdale 345 kV
CountyButler
StateOH
Voltage345 kV
Capacity10.5 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2028-06-01
Source datasetcycle

Same substation and county

Woodsdale substation: 8 requests in the PJM queue, 7 active totaling 100.9 MW.

Queue IDProjectMWResourceStatus
AE2-267Woodsdale Renewable Energy Center28.6SolarSuspended
C01-1220Woodsdale 345 kV13.6GasActive
C01-1221Woodsdale 345 kV12.8GasActive
C01-1101Woodsdale 345 kV12.4GasActive
C01-1222Woodsdale 345 kV11.8GasActive
C01-1217Woodsdale 345 kV11.2GasActive
AF1-247Woodsdale 345 kV30.9SolarWithdrawn

Butler, OH: 24 requests in the PJM queue, 11 active totaling 874.9 MW.

A substation with the same name is named in PJM transmission planning materials: Woodsdale (DEOK, 11 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperDuke Energy Kentucky, Inc
Transmission ownerDEOK
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy5.7
MW capacity10.5
MFO99.5
Submitted date4/24/2026
Last updated6/26/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first