Woodsdale Renewable Energy Center

PJM queue ID AE2-267

Woodsdale Renewable Energy Center (AE2-267) is listed in the PJM interconnection queue as a 28.6 MW solar project in Butler County, OH. The filing names Woodsdale as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of June 1, 2026.

Queue IDAE2-267
Project nameWoodsdale Renewable Energy Center
Status (as published)Suspended
SubstationWoodsdale
Point of interconnectionWoodsdale 345 kV
CountyButler
StateOH
Voltage345 kV
Capacity28.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-06-01
Source datasetserial

Same substation and county

Woodsdale substation: 8 requests in the PJM queue, 7 active totaling 100.9 MW.

Queue IDProjectMWResourceStatus
C01-1220Woodsdale 345 kV13.6GasActive
C01-1221Woodsdale 345 kV12.8GasActive
C01-1101Woodsdale 345 kV12.4GasActive
C01-1222Woodsdale 345 kV11.8GasActive
C01-1217Woodsdale 345 kV11.2GasActive
C01-1218Woodsdale 345 kV10.5GasActive
AF1-247Woodsdale 345 kV30.9SolarWithdrawn

Butler, OH: 24 requests in the PJM queue, 11 active totaling 874.9 MW.

A substation with the same name is named in PJM transmission planning materials: Woodsdale (DEOK, 11 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-02 Status change n/a Engineering and Procurement → Suspended

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy49
MW capacity28.6
MFO49

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first