Substation Scout

Butler, OH interconnection queue

11 active projects totalling 874.9 MW in the PJM queue, plus 13 with terminal status (shown greyed).

11active projects
874.9active MW
24total filed
Queue IDProjectkVMWResourceStatus
Z1-079 Middletown Energy Center 345 513 Gas In Service
W1-058A_DK1 AK Steel Middletown-AK Steel 1C 138kV 138 134.5 Gas Withdrawn
C01-1286 Garver 345 kV 345 125 Battery Active
V3-045 Meldahl Hydroelectric Plant 345 112 Hydro In Service
AG2-664 TodHunter – Trenton 138 kV 138 80 Battery Withdrawn
AH1-516 Springfield Road - Springfield Road 69 kV 69 44.7 Solar Withdrawn
AD2-146 Wiley 138 kV 138 42 Solar Withdrawn
AD2-147 South Charleston 345kV 345 42 Solar Withdrawn
Z2-091 Woodsdale Road n/r 36 Gas Withdrawn
AI1-092 Collinsville - Springfield Road 69 kV 69 31.5 Solar Withdrawn
AF1-247 Woodsdale 345 kV 345 30.9 Solar Withdrawn
AI1-150 Locust - Todd 69 kV 69 29.9 Hybrid Withdrawn
AH1-333 Miller - Canal 69kV 69 28.8 Solar Withdrawn
AE2-267 Woodsdale Renewable Energy Center 345 28.6 Solar Engineering and Procurement
C01-2186 Garver 345 kV 345 24 Gas Active
AH1-530 Fairfield – Reily 69 kV 69 16.8 Solar Withdrawn
C01-1220 Woodsdale 345 kV 345 13.6 Gas Active
C01-1221 Woodsdale 345 kV 345 12.8 Gas Active
C01-1101 Woodsdale 345 kV 345 12.4 Gas Active
C01-1222 Woodsdale 345 kV 345 11.8 Gas Active
C01-1217 Woodsdale 345 kV 345 11.2 Gas Active
C01-1218 Woodsdale 345 kV 345 10.5 Gas Active
X1-058A_DK2 Todhunter 69kV 69 7.6 Solar Withdrawn
AG2-282 Kuranga Power Generator n/r 3.1 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.