Wiley substation interconnection queue
1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD2-146 | Wiley 138 kV | 138 | 42 | Solar | Withdrawn |
| Z1-065 | Willey Energy Storage Project | 34.5 | 0 | Battery | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.