Substation Scout

Wiley substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD2-146 Wiley 138 kV 138 42 Solar Withdrawn
Z1-065 Willey Energy Storage Project 34.5 0 Battery In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.