Garver substation interconnection queue
2 active projects totaling 149 MW in the PJM queue.
2 PJM queue filings name Garver as the point of interconnection, all in Butler County, OH.
Target commercial operation dates as filed run from Apr 2029 to Oct 2030 (2 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: DEOK (2 filings).
2active projects
149active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1286 | Garver 345 kV | 345 | 125 | Battery | Active | Apr 2029 |
| C01-2186 | Garver 345 kV | 345 | 24 | Gas | Active | Oct 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.