TSS 971 Prairie 345 kV
PJM queue ID C01-1858
TSS 971 Prairie 345 kV (C01-1858) is listed in the PJM interconnection queue as a 200 MW battery project in McHenry County, IL. The filing names TSS 971 Prairie as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2031.
| Queue ID | C01-1858 |
|---|---|
| Project name | TSS 971 Prairie 345 kV |
| Status (as published) | Active |
| Substation | TSS 971 Prairie |
| Point of interconnection | TSS 971 Prairie 345 kV |
| County | McHenry |
| State | IL |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2031-12-31 |
| Source dataset | cycle |
Same substation and county
TSS 971 Prairie substation: 3 requests in the PJM queue, 2 active totaling 400 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1857 | TSS 971 Prairie 345 kV | 200 | Battery | Active |
| C01-1859 | TSS 971 Prairie 345 kV | 138 | Solar | Withdrawn |
McHenry, IL: 35 requests in the PJM queue, 12 active totaling 1,510 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Pleasant Grove BESS II, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 200.0 |
| MFO | 200.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/23/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.