Substation Scout

Vigo, IN interconnection queue

2 active projects totalling 882.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
882.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-2191 Dequine - Sullivan 345 kV 345 450 Battery Active
C01-2190 Dequine - Sullivan 345 kV 345 432.9 Solar Active
AG2-556 Sullivan - Dequine 345 kV 345 253.4 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.