Suffolk - Nucor Tap 230 kV
PJM queue ID C01-1499
Suffolk - Nucor Tap 230 kV (C01-1499) is listed in the PJM interconnection queue as a 375 MW hybrid project in Gates County, NC. The filing names Suffolk - Nucor Tap as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 1, 2030.
| Queue ID | C01-1499 |
|---|---|
| Project name | Suffolk - Nucor Tap 230 kV |
| Status (as published) | Active |
| Substation | Suffolk - Nucor Tap |
| Point of interconnection | Suffolk - Nucor Tap 230 kV |
| County | Gates |
| State | NC |
| Voltage | 230 kV |
| Capacity | 375 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2030-12-01 |
| Source dataset | cycle |
Same substation and county
Suffolk - Nucor Tap substation: 4 requests in the PJM queue, 2 active totaling 541 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2144 | Suffolk - Nucor Tap 230 kV | 166 | Hybrid | Active |
| C01-1405 | Suffolk - Nucor Tap 230 kV | 120 | Battery | Withdrawn |
| C01-1303 | Suffolk - Nucor Tap 230 kV | 110.4 | Solar | Withdrawn |
Gates, NC: 9 requests in the PJM queue, 4 active totaling 661 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Clenera DevCo, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 375.0 |
| MW capacity | 375.0 |
| MFO | 375.0 |
| Submitted date | 4/25/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.