Meigs, OH interconnection queue
2 active projects totalling 639 MW in the PJM queue, plus 9 with terminal status (shown greyed).
2active projects
639active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| P54 | Racine | 345 | 1,035 | Coal | Withdrawn |
| W3-128 | Sporn-Waterford 345kV | 345 | 652 | Gas | Withdrawn |
| C01-1448 | SPORN - MUSKINGUM 345 kV | 345 | 610 | Nuclear | Active |
| N42 | Mountaineer-Belmont 765kV | 765 | 600 | Coal | Withdrawn |
| AI2-024 | Racine - Ravenswood 69kV | 69 | 36 | Solar | Withdrawn |
| AC1-082 | Great Bend | 69 | 29 | Solar | Partially in Service - Under Construction |
| AC2-048 | Sporn 138kV | 138 | 22.8 | Solar | Withdrawn |
| AI2-313 | Ravenswood-Hemlock 69kV | 69 | 17.1 | Solar | Withdrawn |
| AC2-036 | Ravenswood-East Bashan Switch 69kV | 69 | 12 | Solar | Withdrawn |
| V4-055 | Meigs-Ravenswood 69kV | 69 | 4.2 | Solar | Withdrawn |
| AG2-589 | Ravenswood - Hemlock 69 kV | 69 | 2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.