2 active projects totalling 639 MW in the PJM queue, plus 9 with terminal status (shown greyed).

2active projects
639active MW
11total filed
Queue IDProjectkVMWResourceStatus
P54 Racine 345 1,035 Coal Withdrawn
W3-128 Sporn-Waterford 345kV 345 652 Gas Withdrawn
C01-1448 SPORN - MUSKINGUM 345 kV 345 610 Nuclear Active
N42 Mountaineer-Belmont 765kV 765 600 Coal Withdrawn
AI2-024 Racine - Ravenswood 69kV 69 36 Solar Withdrawn
AC1-082 Great Bend 69 29 Solar Partially in Service - Under Construction
AC2-048 Sporn 138kV 138 22.8 Solar Withdrawn
AI2-313 Ravenswood-Hemlock 69kV 69 17.1 Solar Withdrawn
AC2-036 Ravenswood-East Bashan Switch 69kV 69 12 Solar Withdrawn
V4-055 Meigs-Ravenswood 69kV 69 4.2 Solar Withdrawn
AG2-589 Ravenswood - Hemlock 69 kV 69 2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.