Silver Lake (Red Bus) 345 kV
PJM queue ID C01-1463
Silver Lake (Red Bus) 345 kV (C01-1463) is listed in the PJM interconnection queue as a 240 MW battery project in McHenry County, IL. The filing names Silver Lake (Red Bus) as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 20, 2029.
| Queue ID | C01-1463 |
|---|---|
| Project name | Silver Lake (Red Bus) 345 kV |
| Status (as published) | Active |
| Substation | Silver Lake (Red Bus) |
| Point of interconnection | Silver Lake (Red Bus) 345 kV |
| County | McHenry |
| State | IL |
| Voltage | 345 kV |
| Capacity | 240 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-20 |
| Source dataset | cycle |
Same substation and county
Silver Lake (Red Bus) substation: 2 requests in the PJM queue, 2 active totaling 360 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1462 | Silver Lake (Red Bus) 345 kV | 120 | Battery | Active |
McHenry, IL: 35 requests in the PJM queue, 12 active totaling 1,510 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Monarch Grid, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 240.0 |
| MFO | 400.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.