Shawboro Solar
PJM queue ID AE1-072
Shawboro Solar (AE1-072) is listed in the PJM interconnection queue as a 98.6 MW solar project in Currituck County, NC. The filing names Shawboro-Sligo as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 1, 2027.
| Queue ID | AE1-072 |
|---|---|
| Project name | Shawboro Solar |
| Status (as published) | Under Construction |
| Substation | Shawboro-Sligo |
| Point of interconnection | Shawboro-Sligo 230 kV |
| County | Currituck |
| State | NC |
| Voltage | 230 kV |
| Capacity | 98.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-01 |
| Source dataset | serial |
Same substation and county
Shawboro-Sligo substation: 4 requests in the PJM queue, 1 active totaling 98.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-181 | Shawboro-Sligo 230 kV | 105 | Solar | Withdrawn |
| AA1-132 | Shawboro East Ridge Solar Park | 42 | Solar | Withdrawn |
| AA1-049 | Shawboro East Ridge Solar Park | 14 | Solar | Withdrawn |
Currituck, NC: 17 requests in the PJM queue, 5 active totaling 305.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 150 |
| MW capacity | 98.6 |
| MFO | 150 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.