Shawboro Solar

PJM queue ID AE1-072

Shawboro Solar (AE1-072) is listed in the PJM interconnection queue as a 98.6 MW solar project in Currituck County, NC. The filing names Shawboro-Sligo as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 1, 2027.

Queue IDAE1-072
Project nameShawboro Solar
Status (as published)Under Construction
SubstationShawboro-Sligo
Point of interconnectionShawboro-Sligo 230 kV
CountyCurrituck
StateNC
Voltage230 kV
Capacity98.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-01
Source datasetserial

Same substation and county

Shawboro-Sligo substation: 4 requests in the PJM queue, 1 active totaling 98.6 MW.

Queue IDProjectMWResourceStatus
AD2-181Shawboro-Sligo 230 kV105SolarWithdrawn
AA1-132Shawboro East Ridge Solar Park42SolarWithdrawn
AA1-049Shawboro East Ridge Solar Park14SolarWithdrawn

Currituck, NC: 17 requests in the PJM queue, 5 active totaling 305.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity98.6
MFO150

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.