Bryan - Lockwood Rd. substation interconnection queue

1 active project totaling 192.4 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Bryan - Lockwood Rd. as the point of interconnection, all in Defiance County, OH.

Target commercial operation date as filed: Sep 2030 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEP (2 filings).

1active projects
192.4active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1781 Bryan - Lockwood Rd. 138 kV 138 192.4 Solar Active Sep 2030
C01-1775 Bryan - Lockwood Rd. 138 kV 138 90 Battery Withdrawn Sep 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05C01-1775Terminal status90 Active → Withdrawn

Other PJM queue substations in Defiance County, OH

All 21 PJM queue filings in Defiance County, OH.