Defiance, OH interconnection queue

8 active projects totalling 497.6 MW in the PJM queue, plus 13 with terminal status (shown greyed).

8active projects
497.6active MW
21total filed
Queue IDProjectkVMWResourceStatus
Z1-018 Richland III 138kV 138 591 Gas Withdrawn
C01-1781 Bryan - Lockwood Rd. 138 kV 138 192.4 Solar Active
AE2-331 Mark Center 69 kV 69 139.2 Battery Withdrawn
C01-1775 Bryan - Lockwood Rd. 138 kV 138 90 Battery Active
C01-1983 Richland - Lockwood 138 kV 138 58.5 Hybrid Active
C01-1703 Richland 138 kV 138 56.8 Gas Active
AH1-735 Richland 138 kV 138 55 Gas Withdrawn
AE2-322 Mark Center Solar Project 69 40.3 Solar Partially in Service - Under Construction
Z1-021 Richland II 138kV 138 36 Gas Withdrawn
AC1-167 Mark Center Solar Project 69 33.6 Solar Partially in Service - Under Construction
AB2-155 Richland-Stryker n/r 25 Gas Withdrawn
AF2-127 Lockwood Road 138 kV 138 24.9 Solar Withdrawn
C01-1633 South Hicksville - Sowers 138 kV 138 21 Solar Active
AF1-047 Mark Center 69 kV 69 20.9 Battery Withdrawn
AF2-209 South Hicksville-Sowers 138 kV 138 19.6 Solar Withdrawn
W4-006 S. Hicksville-Lockwood Road 138kV 138 19.5 Wind Withdrawn
AF1-063 Lockwood Road 138 kV 138 19.3 Solar Withdrawn
Z1-020 Richland I 138kV 138 15 Gas Withdrawn
AH1-770 Not reported n/r 12.9 Solar Withdrawn
AC1-181 Richland Power Plant 138 5 Gas In Service
Z1-022 Stryker 138kV 138 5 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.