Potter substation interconnection queue

1 active project totalling 15.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
15.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB1-082 IMG Generation Potter Facility 46 19.9 Gas Withdrawn
AE2-074 Potter Solar 46 15.1 Solar Partially in Service - Under Construction

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.