Substation Scout

Potter, PA interconnection queue

4 active projects totalling 64.2 MW in the PJM queue, plus 21 with terminal status (shown greyed).

4active projects
64.2active MW
25total filed
Queue IDProjectkVMWResourceStatus
AE2-146 Gold 115 kV 115 76 Solar Withdrawn
AG2-463 Gold – Tennessee Gas 115 kV II 115 48 Solar Withdrawn
AI2-087 Gold-Sabinsville 115kV III 115 42.5 Wind Withdrawn
C01-2126 Hector 115 kV 115 32 Wind Active
AG2-415 Gold – Tennessee Gas 115 kV 115 20 Hybrid Withdrawn
Q24 Gold-Sabinsville 115kV 115 20 Wind Withdrawn
AI2-121 Hector 115 kV 115 20 Wind Withdrawn
AB1-082 IMG Generation Potter Facility 46 19.9 Gas Withdrawn
O59 Gold 115 19.8 Wind Withdrawn
AG1-392 Gold 115 kV I 115 18 Solar Withdrawn
AG1-392A Gold 115 kV II 115 18 Solar Withdrawn
AE2-074 Potter Solar 46 15.1 Solar Partially in Service - Under Construction
AC1-187 Potter-Gold 115kV 115 15 Wind Withdrawn
T121 Potter Wind Farm 115 15 Wind Withdrawn
Z1-069 Big Level Wind Farm 115 13.3 Wind In Service
Y1-032 Potter-Gold 115kV 115 12.9 Wind Withdrawn
N36 Gold Sabinsville 115 10 Wind Withdrawn
O52 Potter WF 115 10 Wind Withdrawn
AG1-392B Gold 115 kV III 115 9 Solar Withdrawn
AG1-392C Gold 115 kV IV 115 9 Solar Withdrawn
AH1-002 Hector 115 kV 115 7.4 Wind Withdrawn
AH1-500 Conesville Junction – Parkview Road Junction 46 kV 46 6.5 Solar Withdrawn
AG2-610 Gold 12.5 kV 12.5 3.9 Solar Withdrawn
AB1-160 Big Level Wind Farm 115 3.8 Wind In Service
T39 Coudersport 46kV 46 3.6 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.