Hector substation interconnection queue

1 active project totalling 32 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
32active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-2126 Hector 115 kV 115 32 Wind Active
AI2-121 Hector 115 kV 115 20 Wind Withdrawn
AH1-002 Hector 115 kV 115 7.4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.