Gold substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-146 | Gold 115 kV | 115 | 76 | Solar | Withdrawn |
| O59 | Gold | 115 | 19.8 | Wind | Withdrawn |
| AG2-610 | Gold 12.5 kV | 12.5 | 3.9 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.