Substation Scout

Gold substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-146 Gold 115 kV 115 76 Solar Withdrawn
O59 Gold 115 19.8 Wind Withdrawn
AG2-610 Gold 12.5 kV 12.5 3.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.