Substation Scout

Potter Solar

PJM queue ID AE2-074

Queue IDAE2-074
Project namePotter Solar
Status (as published)In Service
SubstationPotter
Point of interconnectionPotter 46 kV
CountyPotter
StatePA
Voltage46 kV
Capacity15.1 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2026-07-31
Source datasetserial

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-21 Status change n/a Partially in Service - Under Construction → In Service

Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy35
Mw Capacity15.11
Mfo35

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.